Fort Rucker, AL
Abatement, Demolition & Renovation
OSE was a key subcontractor on a USACE Mobile helicopter hangar abatement, demolition and renovation contract at the US Army Garrison Fort Rucker. OSE removed all infrastructure and siding from the building, salvaging or recycling as much material as possible to divert the waste from reaching a landfill.
Asbestos & Mold Abatement
OSE also performed asbestos and mold abatement. The majority of the work was performed above 10 feet off the ground and all OSE employees followed OSHA standards for fall protection. Work was completed with no injuries or safety violations. OSE maintained the project schedule to ensure the renovations could proceed as planned.
More Projects Like This:
Hydrostatic Testing
One of OSE’s automotive clients recently required hydrostatic testing prior to putting their ...
Preserve Parkway Erosion Control
In a project to support ALDOT, One Stop Environmental installed erosion control for sidewalk ...
The GSA Vance Federal Building
One of our abatement division’s largest jobs to date, was the GSA Vance Federal Courthouse ...
Callahan Eye Hospital Asbestos Abatement
One Stop performed asbestos abatement at the Callahan Eye Hospital in order to support the UAB ...