Hoover, AL
In a project to support ALDOT, One Stop Environmental installed erosion control for sidewalk construction along Preserve Parkway. The parkway is adjacent to Moss Rock Preserve in Hoover, Alabama. The controls we installed were to prevent sediments from washing into the wetlands. In five days, our two man team dug a trench using an excavator, installed a silt fence, and back filled. All of our operators implement and maintain effective erosion and sediment controls in accordance with Best Management Practices Plan (BMP). All of our projects are installed by Qualified Credentialed Professionals (QCP) and in accordance with all state and federal standards.
One Stop completes erosion control projects of all sizes across the southeast. For estimates please contact us at 205-595-8188.
More Projects Like This:
Retention Pond Remediation Plant Miller
One Stop Environmental recently completed an ash pond remediation project at Alabama Power’s ...
Camp Sibert
Camp Sibert was the first large-scale chemical agent training area in the United States and ...
Fort Polk
This effort was to support the U.S. Army Corps of Engineers, Engineering & Support Center ...
Site P-11 Yellow River, NRCS
Watershed Protection Project In 2010 One Stop completed a watershed protection project for ...