Preserve Parkway

Hoover, AL

In a project to support ALDOT, Ambipar Response OSE installed erosion control for sidewalk construction along Preserve Parkway. The parkway is adjacent to Moss Rock Preserve in Hoover, Alabama. The controls we installed were to prevent sediments from washing into the wetlands. In five days, our two man team dug a trench using an excavator, installed a silt fence, and back filled. All of our operators implement and maintain effective erosion and sediment controls in accordance with Best Management Practices Plan (BMP). All of our projects are installed by Qualified Credentialed Professionals (QCP) and in accordance with all state and federal standards.

OSE completes erosion control projects of all sizes across the southeast. For estimates please contact us at 205-595-8188.

Leave a Reply