Birmingham, AL Our abatement division assisted the Alabama Trust for Historic Preservation with the cleanup of Powell School after a fire erupted in the building on January 7, 2011. Birmingham Fire and Rescue Service was able to bring the fire under control, and while the roof and upper floor collapsed, the building remained structurally sound … Read More
Archives
Abatement, Demolition & Renovation
Abatement, Demolition & Renovation OSE was a key subcontractor on a USACE Mobile helicopter hangar abatement, demolition and renovation contract at the US Army Garrison Fort Rucker. OSE removed all infrastructure and siding from the building, salvaging or recycling as much material as possible to divert the waste from reaching a landfill. Asbestos & Mold … Read More
Asbestos Abatement
Chicago Bridge & Iron was an old manufacturing facility founded in the early part of the last century to make bridge components using heat resistant systems. Chicago Bridge & Iron products required insulation materials using asbestos. Changes in environmental law required that all asbestos materials be removed from this facility. Ambipar Response OSE teamed up … Read More
Lead Abatement
Ambipar Response OSE recently completed a lead abatement project at Remington’s research and development firing range. When our team arrived at the 25 meter range located in Huntsville, AL, lead levels were at 1,100 micro grams per square foot. After an onsite assessment with our client, our team determined the best course of action for … Read More
Asbestos/Lead/Mold Abatement
In early 2011 Ambipar Response OSE was awarded a $1 million dollar contract to perform asbestos, lead and mold abatement for the Department of Agriculture’s Jamie Whitten Delta States Research Center. The center is one of the major research establishments of Agricultural Research Service. The Center consists of seven Research Units, with scientists conducting basic … Read More
Asbestos Abatement
In 2016 Ambipar Response OSE completed a large scale, asbestos abatement project at the Marshall Space Flight Center in Huntsville, Alabama. Our team removed asbestos from piping and duct work primarily. Manlifts were extended one hundred plus feet in the air to access and remove all of the asbestos-containing material. OSE personnel also worked off … Read More
Asbestos Abatement
Ambipar Response OSE performed asbestos abatement at the Callahan Eye Hospital in order to support the UAB HS Facilities and Capitol Projects department. Our team removed asbestos wall board, floor tile and mastic, and thermal systems insulation from the occupied building. We carefully abated near operating rooms and other areas of high importance. Some of … Read More
Hospital Interior Demolition & Abatement Services
In support of the general contractor performing renovations at UAB Medical West Hospital, Ambipar Response OSE completed selective interior demolition and abatement services. As this was an occupied facility, OSE was required to perform this work under close owner and contractor supervision to ensure minimal patient disruption. OSE removed and disposed of specific building materials … Read More
Asbestos Abatement
In 2015 Ambipar Response OSE completed a large scale asbestos abatement project at the Thomas Jefferson Hotel (later the Cabana Hotel, then Leer Tower) in Birmingham, AL. The 19 story building completed in 1929 is well known for having the last rooftop zeppelin mooring mast in the world. It is one of the multiple revitalization … Read More
Asbestos/Lead/Mold Abatement
One of our abatement division’s largest jobs to date, was the GSA Vance Federal Courthouse renovation project. The Federal Building and United States Courthouse is a four story white marble building in the Classical Revival style. It occupies an entire block on 5th Avenue, between 18th and 19th Streets in the Central Business District of … Read More